Becker High School - Becker, MN
Educational Building Construction
Becker High School & Aquatic Center
Client
City of Becker
Role
Construction Manager
Completion Date
September 2013
Project Size
57,000 SF
Elements of Construction
Project management administrative and on-site management, concrete work, rough carpentry, finish carpentry for installation of cabinets, millwork, doors, door frames, hardware and miscellaneous accessories.
New 57,000 SF addition to Becker High School which includes a pool and auditorium addition with new building entries.
The Natatorium addition includes an 8 lane – 195,000 gallon, 25-yard competitive lap pool and a 128,000 gallon competitive dive pool with two (2) one-meter boards. The pools are constructed with reinforced shotcrete. The pool finish is diamond brite plaster with ceramic tile lane markers and a perimeter stainless steel recirculating system. The pool disinfection system is Vantage calcium hypochlorite erosion chlorinator with prominent control. The pool decks are all sloped to drain with a non-slip, non-absorbent resinous flooring system. The pools are equipped with underwater loudspeakers and all related safety equipment.
The superstructure for the building is decorative pre-cast wall panels with long span pre-cast double tee roof panels. The shower and locker room are located adjacent to the pools and are construction of decorative concrete block. Above the locker are is a pool observation bleacher area with 310 bleacher seats.
Atwater-Cosmos-Grove City Senior/Junior High School
Client
Atwater Cosmos Grove City School District
Role
Construction Manager/Prime Contractor
Completion Date
Fall 2022
Project Size
30,000+ SF
Elements of Construction
Project management administrative and on-site management, demolition, concrete, carpentry, miscellaneous site-work.
WGCC recent finished renovations at Atwater-Cosmos-Grove City Senior/Junior High School. Improvements included a new roof, cosmetic exterior upgrades, a new front entrance and a new district office complete with secure entrances.
Newly paved parking lots with a secure bus pickup area and sidewalks improved the safety and flow of car and foot traffic in and out of the school. Over 30,000 SF of exterior wall panels were erected to give the school a fresh, bold feel ready to greet the coming generations of students.
Hutchinson High School
Client
Hutchinson Schools
Role
Construction Manager/Prime Contractor
Completion Date
Fall 2019
Project Size
283,000+ SF
Elements of Construction
Project management administrative and on-site management, demolition, concrete, carpentry, miscellaneous site-work.
Over 283,000 square-feet of construction starts with demolishing a classroom wing and building in its place a three-story classroom wing, remodeling of the existing core space, security improvements and revisions to parking and traffic flow. A new commons area for students to use during the day and for visitors to use during events will be added. At the center of the redesign is a large commons area where many of the hallways intersect.
The commons is intended to be used for student assembly, presentations, large gatherings of students, study groups, socializing and other activities. The aging building needs renovations to repair drafts and update the heating and electrical systems. New “flex rooms” will provide space for students to work in groups. Technology will be available for projects, including large screens for students to plug personal devices into. The rooms will be muffled to avoid interruptions from outside, but large glass windows will make it easy for staff to monitor.